Starlake The Prime Price & Payment Schedule: VND 180–270m/m², 7 Instalments, BIDV & Shinhan Loans

Posted by Khoi Pham on November 8, 2025
0 Comments

Updated 8 November 2026 — quick answer: Expected Starlake The Prime price: VND 180–270 million per m² of net area, excluding VAT, averaging about VND 220 million per m² (depending on floor and view): a 1BR comes to about VND 8.5–13.2 billion and a 3BR VND 19.4–30.9 billion. Starlake The Prime K8CT1 is paid in 7 instalments: 5 instalments of 10% each from SPA signing (standard schedule: instalment 2 on 15 December 2026, instalment 5 on 15 April 2028), 45% plus the 2% maintenance fund and 3 months’ management fee at handover (expected 1 October 2028), and 5% on receipt of the ownership certificate (pink book). New on 7 November 2026: the developer announced a policy that moves instalment 2 from 15 December 2026 to 15 May 2027 (five months later), with the following 10% instalments pushed to October 2027, April 2028 and July 2028; the total due before handover is still 50% and the sale price does not change. According to the developer, this policy is for Vietnamese buyers who pay the first instalment before 15 December 2026, on selected stacks and floors — foreign buyers and Viet Kieu should let Realtique confirm the terms with the developer for the specific unit before reserving. The developer does not take deposits: you reserve the unit for 36–48 hours, then transfer the full 10% to the unit’s dedicated account. Paying ahead of schedule earns an early-payment discount of 5.5% a year; BIDV lends up to 85% (fixed rates from 9.0%) and Shinhan up to 80% over 30 years.

Source: the Starlake The Prime K8CT1 brochure, Q&A document and sales handbook issued by the developer in October 2026.

Đỉnh toà tháp Starlake The Prime với mặt kính và view Hồ Tây lúc hoàng hôn
Curtain-wall inspired facade of Starlake The Prime overlooking West Lake at sunset. Image: THT Development / Daewoo E&C

Contents

K8CT1 price and payment policy
Per the sales handbook effective 12 October 2026
Expected price
VND 180–270m/m² net, excl. VAT · avg. ~VND 220m/m²
SPA signing
10% of the contract value
Standard schedule
Instalment 2 on 15 December 2026 · 50% paid by 15 April 2028
Policy of 7 November 2026
Instalment 2 moves to 15 May 2027 · final 10% in July 2028
Handover (~1 October 2028)
45% + 2% maintenance fund + 3 months’ management fee
Ownership certificate
5%
Deposit
No deposit · 36–48-hour reservation
Early payment
5.5% a year discount, on 10–40% of the contract value
BIDV loan
Up to 85%, 20 years, fixed from 9.0%
Shinhan loan
Up to 80%, 30 years, 5-year principal grace period
Bank guarantee
Towers A, D: BIDV · Towers B, C: Shinhan
Management fee
VND 29,000 per m² per month (excl. VAT)
Expected price updated by Realtique on 21 October 2026; official prices follow the developer’s price list. Contract value = sale price including VAT, excluding the maintenance fund. Loan rates follow each bank’s programme at the time of announcement and may change.

Expected Starlake The Prime price at K8CT1

The expected price of K8CT1 is VND 180–270 million per m² of net area, excluding VAT, averaging about VND 220 million per m². Prices vary by floor and view: high-floor units with full West Lake (Ho Tay) views sit at the top of the range, while lower-floor units or those facing the internal grounds sit at the lower end. The table below converts this into estimated prices for all 16 unit types (VND billion, excluding VAT):

Unit typeNet area (m²)VND 180m/m²VND 220m/m² (avg.)VND 270m/m²
1BR CA48.978.810.813.2
1BR CB47.418.510.412.8
2BR CA84.4315.218.622.8
2BR CB84.2615.218.522.8
3BR CA112.2320.224.730.3
3BR CB111.6320.124.630.1
3BR CC113.4820.425.030.6
3BR CD114.4720.625.230.9
3BR CE107.6319.423.729.1
3BR CF108.7419.623.929.4
3BR CG110.0119.824.229.7
3BR CH111.9020.124.630.2
4BR CA143.9225.931.738.9
Penthouse CA229.3741.350.561.9
Penthouse CB221.7239.948.859.9
Penthouse CC221.8339.948.859.9

Realtique estimate = net area × expected price per m². Excludes VAT (apartments carry 10% VAT on the price after deducting land use fees) and the 2% maintenance fund. The official price of each unit follows the developer’s price list at the time of the sales launch.

The 7-instalment payment schedule (standard schedule)

Standard schedule, Starlake The Prime K8CT1 (contract value including VAT)
Instalment 1
10%
On signing the SPA
Instalment 2
10%
15 December 2026
Instalment 3
10%
15 May 2027
Instalment 4
10%
15 October 2027
Instalment 5
10%
15 April 2028
Instalment 6
45%
At handover, expected 1 October 2028
Instalment 7
5%
Within 7 days of the developer’s notice to hand over the ownership certificate
Before handover: 50% · At handover: 45% + 2% maintenance fund + 3 months’ management fee · On the ownership certificate: 5%.
InstalmentShareTimingPer VND 1 billion of contract valueCumulative
Instalment 110%On signing the SPAVND 100 million10%
Instalment 210%15 December 2026VND 100 million20%
Instalment 310%15 May 2027VND 100 million30%
Instalment 410%15 October 2027VND 100 million40%
Instalment 510%15 April 2028VND 100 million50%
Instalment 645%At handover, expected 1 October 2028 (plus the 2% maintenance fund and 3 months’ management fee)VND 450 million95%
Instalment 75%Within 7 days of the developer’s notice to hand over the ownership certificateVND 50 million100%

“Contract value” in the schedule means the total sale price including VAT, excluding the 2% maintenance fund. The fourth column makes budgeting easier: for every VND 1 billion of contract value, you pay VND 100 million at each of the first 5 instalments, VND 450 million at handover and VND 50 million when the ownership certificate is issued. The 2% maintenance fund and 3 months’ management fee are paid on top at instalment 6.

So from signing until just before handover (about 2 years), you pay 50%, split evenly into 5 payments roughly 5–6 months apart; most of the rest falls due at handover, when many buyers draw down their bank loan.

This is the standard schedule in the sales handbook effective 12 October 2026. On 7 November 2026 the developer announced an additional policy that pushes instalment 2 back — see the section just below.

Update 8 November 2026: the developer pushes instalment 2 back to 15 May 2027

On 7 November 2026 the developer announced a policy that pushes the second instalment back by five months: from 15 December 2026 to 15 May 2027. The following 10% instalments fall in October 2027, April 2028 and July 2028. The total due before handover is still 50%, with the remainder unchanged at 45% on handover and 5% on the ownership certificate. According to a developer representative, the policy does not change the sale price — only when the money is due.

InstalmentShareStandard schedulePolicy announced 7 November 2026
Instalment 110%On signing the SPAOn signing the SPA
Instalment 210%15 December 202615 May 2027
Instalment 310%15 May 2027October 2027
Instalment 410%15 October 2027April 2028
Instalment 510%15 April 2028July 2028
Instalment 645%At handover, expected 1 October 2028At handover, expected 1 October 2028
Instalment 75%Within 7 days of the developer’s notice to hand over the ownership certificateWithin 7 days of the developer’s notice to hand over the ownership certificate

The announcement gives only the month for instalments 3, 4 and 5 (10/2027, 4/2028, 7/2028), not the exact day; the precise dates follow each unit’s contract appendix.

Luỹ kế thanh toán Starlake The Prime K8CT1 trên mỗi 1 tỷ đồng: lịch tiêu chuẩn so với chính sách giãn đợt 2 / Starlake The Prime K8CT1 cumulative payment per VND 1 billion: standard schedule vs extended second instalment
The same 50% before handover — only the timing changes. Graphic: Realtique · Data: developer sales handbook dated 12 Oct 2026 and the policy notice of 7 Nov 2026.

Conditions as announced by the developer: the policy is for Vietnamese buyers who pay the first instalment before 15 December 2026, and only for units on selected stacks and floors — not the whole inventory. The developer releases the list of eligible units for each sales phase; Realtique checks it for the exact unit, tower and floor you are considering.

How Realtique reads this policy. The total does not change, so what really changes is cash flow. On the standard schedule, a buyer signing in November or early December 2026 has to find 20% within a few weeks (10% at signing and 10% on 15 December 2026). Under the new policy the gap between the first two payments stretches to about half a year, so you end 2026 at just 10%. In exchange, the final 10% instalment moves to July 2028, roughly 3 months before the expected handover date of 1 October 2028 instead of nearly 6: the last 10% and the 45% handover payment now sit closer together. If you plan to draw down a mortgage at handover, budget for both in the same period — particularly while home-loan rates remain high.

One more point: the 5.5%-a-year early-payment discount described below is calculated on the number of days you pay ahead of the due date of the instalment concerned. When a due date moves later, the same amount paid on the same day counts as “earlier” — but the exact method (day-count basis, start date) still follows the developer’s early-payment appendix, so let Realtique request the calculation for your specific unit rather than estimating it yourself.

What should foreign buyers and Viet Kieu note?
  • The announcement states that the policy applies to Vietnamese buyers. For foreign buyers, the standard schedule in the table above is still the one that applies until the developer confirms otherwise.
  • Viet Kieu who hold documents proving Vietnamese nationality are usually treated as domestic buyers, but this has to be confirmed by the developer case by case — Realtique asks on your behalf before you reserve.
  • The application to sell to foreign buyers at K8CT1 has been filed and had not been approved as of this update; Realtique checks the approval status and the remaining quota before each reservation.
  • The current sales policy does not apply to buyers holding Chinese (PRC) nationality.

The wider context. The developer says that after launching towers K8A and K8D on 25 October 2026, the project has now brought the remaining two towers, K8C and K8B, to market — the final launch phase, completing the release of all 656 apartments at K8CT1. On the retail side, Takashimaya Department Store and Tiso Mall are expected to open in Q2 2027, after the Shilla Monogram complex began operating. These opening dates are plans and may change.

Sources: VnExpress, 7 November 2026 (“Starlake The Prime K8CT1 extends its payment schedule by five months”) and CafeF the same day, 7 November 2026, both citing the developer’s announcement. The standard schedule follows the Starlake The Prime K8CT1 sales handbook effective 12 October 2026. Realtique compiled and compared the two schedules; sales policies may be adjusted by the developer from phase to phase.

Worked example: what a 112.23 m² 3BR costs, and when

Take a 3BR CA (112.23 m² net, found in Towers A and B) at the average price of VND 220 million per m²: the price before VAT is about VND 24.69 billion. Adding the full 10% VAT for budgeting purposes, the contract value comes to about VND 27.16 billion; the 2% maintenance fund is about VND 494 million, and 3 months’ management fee about VND 9.8 million (excluding VAT).

InstalmentTimingShareAmount (VND billion)Cumulative (VND billion)
Instalment 1On signing the SPA10%2.722.72
Instalment 215 December 202610%2.725.43
Instalment 315 May 202710%2.728.15
Instalment 415 October 202710%2.7210.86
Instalment 515 April 202810%2.7213.58
Instalment 6At handover, expected 1 October 202845%12.73 (including the maintenance fund and 3 months’ management fee)26.31
Instalment 7Within 7 days of the developer’s notice to hand over the ownership certificate5%1.3627.66

From signing to 15 April 2028, each instalment is about VND 2.72 billion, about VND 13.58 billion in total; the largest payment, about VND 12.73 billion, falls at handover. If you pay instalments 2–4 upfront when signing on 15 November 2026 (30% of the contract value), the early-payment discount comes to about VND 223 million. Actual VAT is charged on the price after deducting land use fees, so it may be lower than this provisional figure. If you need the figures for another unit, tower or view, Realtique will prepare them for the exact unit you choose.

Reservation and SPA signing: no deposit

  1. Reserve the unit on the Daewoo E&C Vina sales system; the reservation is valid for 36–48 hours (the exact window is announced before each sales release). Required details: full name, Vietnamese phone number (verified by OTP), email, permanent address and contact address.
  2. Transfer instalment 1 (10%) to the unit’s dedicated virtual account within the reservation window. The developer does not take deposits and does not allow sales agents to collect any money; every payment goes only into the developer’s account.
  3. Sign the SPA about 15 working days after the complete file is received; the developer countersigns and returns the signed set 15 working days later.
  4. Pay according to the schedule, with a notice before each instalment.

Buyer details must match your documents, and the buyer’s name cannot be changed after reservation. A payment made on your behalf by another person requires a duly signed third-party payment confirmation.

Documents: Vietnamese buyers need a citizen ID card and a level-2 VNeID electronic identity; companies need a notarised business registration certificate. Foreign buyers need a passport valid for at least 6 more months bearing a Vietnamese entry stamp, a residence card (if living in Vietnam) or a return air ticket, and an identity document issued by their home country; no visa is required, but you must enter Vietnam within 1 month of the payment date to sign. The developer has filed its application to sell to foreign buyers; Realtique checks the approval status and remaining quota before you reserve a unit. The current sales policy does not apply to buyers holding Chinese (PRC) nationality.

Early-payment discount of 5.5% a year

Buyers who pay ahead of schedule receive a preferential rate of 5.5% a year, applied to the amount paid early and the number of days it is paid early. Conditions:

  • Pay at least 30 days before the due date of the relevant instalment.
  • The amount paid early is 10% to 40% of the contract value, transferred before instalment 6; each unit can take part once only.
  • Sign the developer’s Early Payment Addendum; the discount is transferred back to you within 30 working days.
Worked examples (Realtique estimates)
  • Paying VND 100 million 180 days early: 100,000,000 × 5.5% × 180/365 ≈ VND 2.71 million.
  • Signing the SPA on 15 November 2026 and paying instalments 2–4 at once (30% of the contract value, i.e. VND 300 million per VND 1 billion): instalment 2 is paid 30 days early, instalment 3 181 days early and instalment 4 334 days early, for a total discount of about VND 8.2 million per VND 1 billion of contract value.
  • The exact calculation (day-count basis, start date) follows the developer’s Early Payment Addendum.

Bank loans: BIDV and Shinhan Bank

BankPreferential rateLoan amount / term
BIDV (from 25 September 2026)First-time home buyers: fixed 9.0% (12 months), 9.5% (18 months), 10.0% (24 months). Other borrowers: 9.5% / 10.0% / 10.5%. After the preferential period: margin from 4.7% a yearUp to 85% of the property value, maximum 20 years; early repayment fee 2% (first 24 months), 1% (from month 25)
Shinhan BankFloating rate from 9.34% a yearUp to 80% of the property value, maximum 30 years, principal grace period of up to 5 years

MB and Vietcombank also lend on the project; the developer uses one standard tripartite agreement for all banks. Rates follow each bank’s programme at the time of announcement and may change. For foreign buyers, loan eligibility depends on each bank’s policy (usually requiring residence and income in Vietnam).

Because instalment 6 accounts for 45%, many buyers pay the 50% due during construction from their own funds and draw down the loan at handover, when the apartment is complete and can be used as collateral.

Bank guarantees by tower

The developer’s obligation to hand over the off-plan apartments is backed by a bank guarantee for each tower: Towers K8B and K8C by Shinhan Bank, Towers K8A and K8D by BIDV. Buyers who want a guarantee letter must notify the developer in advance and pay a fee of 0.8% of the guaranteed amount.

Costs on top of the apartment price

  • 2% maintenance fund: paid with instalment 6 at handover.
  • Management fee of VND 29,000 per m² per month (excluding VAT), applicable until the owners’ board is established; 3 months are paid in advance at handover. Example for a 112 m² net unit: 29,000 × 112 × 3 ≈ VND 9.7 million (excluding VAT). The fee is charged from the date the handover minutes are signed or from 1 October 2028, whichever comes first.
  • Registration fee when the ownership certificate is issued, as set by law (0.5% of the assessed value).
  • Amenities (swimming pools, gym, sauna…) are charged separately at rates the developer announces once they open; parking fees are set at handover.
  • Compulsory fire and explosion insurance for the common property, and annual non-agricultural land use tax.
  • A 0.8% guarantee letter fee, if you request one. The developer charges no fee to confirm the transfer of an SPA once the buyer has met all payment obligations due.

If payment or handover is late

Under the model SPA, a buyer who pays late is charged penalty interest of 0.05% a day on the overdue amount. Conversely, the expected handover date of 1 October 2028 may slip by up to 90 days; if the developer is more than 90 days late, the buyer may choose a new handover date or terminate the contract, receiving a refund with penalty interest plus a penalty of 8% of the sale price. If the actual net area differs by no more than 5%, the price stays the same. The structure carries a 60-month warranty.

Cổng chào và sảnh đón xe có mái che (drop-off canopy) của Starlake The Prime
Hotel-style entrance gate and covered drop-off canopy at Starlake The Prime K8CT1. Image: THT Development / Daewoo E&C

Frequently Asked Questions About the Starlake The Prime Price and Payments

How much do I need to pay to sign for a Starlake The Prime apartment?

Instalment 1 is 10% of the contract value (including VAT), transferred to the unit’s dedicated account within the 36–48-hour reservation window. The developer does not take deposits.

How much will I have paid in total by handover?

Before handover you pay 50% over 5 instalments; at handover (expected 1 October 2028) you pay a further 45% plus the 2% maintenance fund and 3 months’ management fee; the final 5% is paid when you receive the ownership certificate.

How does the Starlake The Prime early-payment discount work?

A preferential rate of 5.5% a year applies to the amount paid early and the number of days paid early (at least 30 days), for early payments of 10–40% of the contract value made before instalment 6, once per unit.

How much can I borrow to buy at Starlake The Prime?

BIDV lends up to 85% of the property value for up to 20 years; Shinhan Bank up to 80% for up to 30 years, with a principal grace period of up to 5 years. MB and Vietcombank also lend on the project.

What is the Starlake The Prime price for K8CT1 apartments?

The expected price is VND 180–270 million per m² of net area, excluding VAT, averaging about VND 220 million per m², depending on floor and view. By unit: 1BR about VND 8.5–13.2 billion, 2BR VND 15.2–22.8 billion, 3BR VND 19.4–30.9 billion, 4BR VND 25.9–38.9 billion and penthouses VND 39.9–61.9 billion (excluding VAT).

What is the payment schedule for a Starlake The Prime 3BR?

For example, a 112.23 m² 3BR CA at VND 220 million per m² costs about VND 24.69 billion before VAT, or a contract value of about VND 27.16 billion with provisional VAT; the first 5 instalments are about VND 2.72 billion each, about VND 12.73 billion is due at handover including the maintenance fund, and about VND 1.36 billion when the ownership certificate is issued.

How do foreign buyers pay for Starlake The Prime?

On the same 7-instalment schedule. You need a passport valid for at least 6 more months with a Vietnamese entry stamp, and you must enter Vietnam within 1 month of the payment date to sign the SPA. The developer has filed its application to sell to foreign buyers; Realtique checks the approval status and remaining quota before you reserve a unit. The current sales policy does not apply to buyers holding Chinese (PRC) nationality.

What is the Starlake The Prime payment-extension policy announced on 7 November 2026?

The developer moves the second instalment from 15 December 2026 to 15 May 2027, five months later; the following 10% instalments fall in October 2027, April 2028 and July 2028. The total due before handover is still 50% and the sale price does not change. According to the announcement, the policy applies to Vietnamese buyers who pay the first instalment before 15 December 2026, on selected stacks and floors.

Does the payment-extension policy apply to foreign buyers and Viet Kieu?

The announcement states that the policy is for Vietnamese buyers, so for foreign buyers the standard schedule is still the one that applies until the developer confirms otherwise. Viet Kieu holding documents that prove Vietnamese nationality are usually treated as domestic buyers, but this must be confirmed by the developer case by case; Realtique asks on your behalf before you reserve.

Talk to Realtique

Get the available units, layouts and price list for Starlake The Prime K8CT1

Leave your details and a Realtique advisor will call you back within two working hours on the right unit type and view, the payment schedule, BIDV/Shinhan loan packages and a visit to the sales gallery.

📞 Hotline / WhatsApp: +84 866 810 689

Leave a Reply

Your email address will not be published.

Compare Listings